Bespoke Grader Blade Attachment Delivers Safe, Efficient Solutions in Remote Pilbara Corridors

Bespoke Grader Blade Attachment Delivers Safe, Efficient Solutions in Remote Pilbara Corridors

Working in the Pilbara’s vast rail networks presents significant logistical challenges, particularly in difficult-to access locations with restricted rail corridor access and limited material laydown areas.

Traditional methods and equipment were not suitable for these conditions, requiring a new approach to ensure efficiency and safety.

PRM takes an innovative approach to problem-solving, evaluating each project’s needs and selecting the right equipment, even if it means designing and fabricating custom attachments.

The Solution

In this instance, track access for a grader was not available. To overcome this, PRM engineered a bespoke grader blade attachment for a CAT® 335 Next Gen Excavator.

360-Degree Rotation: The custom blade can spin in any direction, providing unmatched flexibility.
Advanced Machine Control: Integrated with Trimble Earthworks, ensuring precision grading.
Engcon Tiltrotator: Enhancing maneuverability in steep, narrow, and inaccessible terrain.The Solution

The Outcome

Unmatched Accessibility: Enabled ballast bed preparation in areas previously inaccessible.
Improved Efficiency: Reduced manual intervention and increased grading precision.
Safety Enhancement: Minimised risks associated with operating heavy equipment in challenging environments.
Demonstrated Ingenuity: Showcased PRM’s ability to engineer bespoke solutions tailored to the needs of rail projects

explore case studies

case-study
Innovative Rail Lifter Attachment Enhances Efficiency and Reduces Operational Hazards
case-study
Narrow Head Flashbutt Welder Ensures Precision in Confined Spaces
case-study
Solar-Powered Hydration Stations Boost Workforce Safety and Productivity
FOR FURTHER DETAILS OF OUR SERVICES, PLEASE DOWNLOAD OUR CAPABILITY STATEMENT.